A-Z Project Deckhouse Structure – Development of Manufacturing and Installation Technologies for Cladding Deckhouse Structures with Modular Fibre-Reinforced Foam Panels

Funded by the Federal Ministry for Economic Affairs and Energy (BMWE)
Funding Programme: Central Innovation Programme for SMEs (ZIM)
Project Duration: 01 October 2019 – 30 September 2021
Funding Amount: €182,031

Deckhouse structures on yachts, consisting of side walls and a roof mounted to a steel framework welded to the yacht deck, are typically manufactured from filled and painted aluminium panels. In particular, the filling process is highly time-consuming. In several manual production steps, primer, coarse filler, and fine filler are applied to the panels, followed by surface sanding. The final coating is then applied. Subsequently, components such as doors, portholes, windows, and similar elements are installed. All of these process steps are generally carried out sequentially and on the dry-docked vessel.

Although less filler material is required for deckhouse structures than for hulls, the filler layer still reaches several centimetres in thickness. The objective of this project is therefore to develop a process for manufacturing deckhouse structures using fibre-reinforced sandwich panels with a foam core instead of conventional filler-coated aluminium panels. The concept is to complete the deckhouse modules within an industrial production environment to such an extent that they only need to be attached to the steel framework. The modules will already include windows, doors, cable ducts, and other integrated components and will be delivered fully painted.

The industrialisation of the manufacturing process will ensure consistently high quality. At the same time, the yacht does not necessarily need to remain in the shipyard during panel production, thereby avoiding the significant berthing costs typically incurred today. In the longer term, reducing the time and costs associated with a yacht’s stay in the shipyard may also increase the number of yachts that can be completed each year. This approach makes it possible to combine the requirements of yacht owners for premium quality with the interests of both owners and shipyards in achieving shorter production times and reduced delivery schedules.

The objective of the project was to develop an industrial process chain for the manufacture of deckhouse structures using modular sandwich panels.